Dogwood Bldg Roof Replacement

On Monday, October 20, 2008, we will begin the process of replacing the roof on the Dogwood Building.

As a result of this work, the following will apply:

- We will need to close the circular driveway in front of the Dogwood Building up to the entrance to the Walnut Parking Lot. The Walnut Parking Lot will remain open, but the present exit road will serve as the entrance and exit. Please be careful as this entrance will not accommodate two-way traffic.

- The office residents and classes in the Dogwood Building will also have to be tolerant of occasional construction noise. Occupants of the third floor will most likely have to be the most patient.

- We will attempt to have a minimum of two entrances to the Dogwood Building available throughout the project. For emergency egress, all four Dogwood Building doors will remain available.

- The pick-up and drop-off area for the Early Middle College High School students will move to the Spruce Building driveway.

The entire process will take up to three months. Thank you for your understanding and cooperation during this period.